  • Cath Lab - Hospital Extension

    NHS
    New Build

    Building on our existing relationship with the hospital team as their preferred contractors, we were called on to construct this new extension to make way for a catheterisation laboratory. With the site very tight on space and being fully overlooked by other hospital buildings, health & safety and the correct management of site boundaries was our biggest challenge on this project.

  • Shooting Lodge - Barn Conversion

    BNP Paribas Real Estate
    Refurbishment

    As part of a larger conversion project on a dilapidated barn in the grounds of a stately home, the client had specified a real high-end finish to this beautiful shooting lodge. This project is one of many we’ve worked on for this family, and required exceptional attention to detail and a truly personal touch to attain the quality results and stunning aesthetic required.

  • Office Conversion - Refurbishment Project

    M & Co
    Refurbishment

    Once again working to architects plans, we were asked to take deliver an end-to-end refurbishment solution for this office conversion project. With our experience in working with a range of materials, from Corian to softwoods and hardwood, this project gave us another opportunity to utilise our extensive skills and produce an eye-catching conversion.

  • Cottage - Extension & Refurbishment

    BNP Paribas Real Estate
    Refurbishment

    When we first visited this project we were met with a derelict, downtrodden country cottage with bags of potential! Following the architect’s plans, we took care of the site and stripped it back ready for the building of a new extension and complete refurbishment. The real challenge here was blending the old with the new for a modern yet sympathetic finish.

  • Daisy Court - Flat Rebuild Project

    Aedas
    New Build

    This was quite an unusual project – but a very necessary one from a health and safety point of view. Poor initial construction had meant that these four flats needed to be stripped right down and built back up from scratch, as the original build didn’t meet regulations, had no fire precautions built in and had used out-of date-cement – very poor show!

  • St Josephs School - Feature Entrance Build

    City of Bradford MDC
    Corian Manufacturing

    This job came through an opportunity to tender, which in turn arose through an existing relationship with the project architect. The school wanted a new feature entrance built to link together two existing buildings – of course the main challenges were ensuring the site was safe at all times and working around school activities.